In the current economic and political scenario of Pakistan where new projects of Electrical generation\nseems impossible, one should adopt such means so as to minimize the power consumption\nvia load management. In this paper a relatively better Electrical power system is proposed for\nUniversity of Gujrat (UOG) power system. UOG runs its all generators whether it is full load or\nmerely a load of 20 percent as a standby power. It is suggested that if generators system is synchronized\nand connected in parallel, it can not only minimize the cost, number of personnel required\nbut also increase the reliability of the system. ETAP software is used for simulation and\nresults show that by adopting this method generation cost can be reduced up to 30 percent which\nis indeed a huge figure. Losses and cable parameters were calculated using this software and\nfound this proposal quite feasible.